Tampa General Hospital New Central Energy Plant Expansion and Substation Replacement

Managing multiple central energy plant projects simultaneously, ensuring no interruptions to patient care

Gilbane provided construction management services for the new Central Energy Plant Expansion and Substation Replacement at Tampa General Hospital in Tampa, Florida. The substation replacement was completed in four sequential phases and consisted of replacing existing substation equipment housed on the second floor of the existing central energy plant which currently powers all the chillers for the hospital.

Gallery

01 / 01

Project Overview

  • Simultaneously, Gilbane managed construction of the new central energy plant expansion
  • Four-story, pre-cast clad steel structure
  • This project required an AHCA inspection

“Gilbane maintained a high level of control over the schedule and budget throughout, working closely with the TGH staff and the critical mechanical and electrical trades to ensure the success of the projects.”

Chris Lucus
Construction Services Manager
Tampa General Hospital

Quick Stats

30,000

Square Feet

4

Phases

4

Stories