Osceola County School District Tohopekaliga High School
Early team integration, goal alignment and extensive communication delivers dynamic learning environment
The campus was designed to accommodate more than 3,000-students in a dynamic and collaborative 21st-century learning environment. The facility has the flexibility to adapt to the current and future educational needs of the school district with a heavy emphasis on STEAM (Science, Technology, Engineering, Arts and Math) as well as career and technical education programs such as robotics, biomedical engineering, health sciences, cyber security and alternative energy.
Project Overview
- New 343,000-SF high school on a 75-acre site
- Campus designed to accommodate more than 3,000-student in a dynamic and collaborative 21st-century learning environment
- Utilizing above ceiling BIM clash detection with all the major trades, the team was able to valuate the fastest and safest way to conduct this work after it was fully laid out three-dimensionally
The planned construction of the school provided a substantial opportunity for the local economy and local construction jobs. The cost per student station for the new high school is below the state average.
Quick Stats
- Client:
- Location: Kissimmee, FL
- Architect:
- Size: 343,000 SF
-
Awards:
- ABC Central Florida Chapter, Excellence in Construction Eagle Award, ABC Central Florida Chapter
343,000
3,000
75
Let’s discuss your next project and achieving your goals.
Ask us about our services and expertise.