
Nevada Air National Guard Fire Station Replacement
Award-winning project with many sustainable features
Gilbane provided general contractor services for the Nevada Air National Guard (NANG) in Reno, NV. The new fire station replaced the existing inadequate station and consisted of a two-story building with administrative offices, training and conference rooms, sleeping quarters, individual bedrooms, laundry, living room, and a kitchen for fire department personnel. The main focus of the facility was the seven apparatus bays for fire trucks and other dispatch vehicles which were unique in that each bay was serviceable from each side of the building via large automatic four-fold glass doors.
Project Overview
- State-of-the-art facility included N+2 redundancy as well as a number of specialized systems
- Solar water collector system with 19 roof mounted panels
- Wash bay equipment for truck/car wash, vehicle exhaust removal system
- Air-to-air energy recovery system
- Radiant heating flooring system
“Gilbane brought in an experienced team. Fairness sticks out in my mind when it comes to change orders. It was a challenging and complicated project and Gilbane’s technical expertise and high quality of service was great. Also, the follow up after the project ended was remarkable and Gilbane has stayed involved.”
Lt Col Robert Nicholas
BCE
Nevada Air National Guard – 152nd Airlift Wing
Quick Stats
- Client:
- Location: Reno, NV
- Size: 21,000 SF
-
Awards:
- National Air Force Design Award
15
month schedule
19
roof mounted panels
21,000
square feet

Let’s discuss your next project and achieving your goals.
Ask us about our services and expertise.