Project Cardinal Data Center
Greenfield data center earns LEED Gold Certification
This greenfield data center was located on a 138-acre site and built in four phases with each phase featuring 250 W/SF density scalable to 500 W/SF. A 460,000 SF building was constructed in Phase 1 and included 63,000 SF of total raised floor, 36,000 SF of white space with four-foot raised floor and under-floor cooling, eight emergency generators at 3 MW each, and an IT critical load of 9 MW.
Project Overview
- The project achieved LEED Gold Certification and 31% MBE/WBE contractor participation
- 1100 kVA, 750 kVA, and 400 kVA UPS systems
- 10 data hall Computer Room Air Handling (CRAH) units – 120,000 CFM each
- 94, 20-ton Computer Room Air Conditioning (CRAC) units
- Designed to withstand 200 MPH winds and seismic design category two
“I am extremely pleased with the services Gilbane has provided through the life of the project; from preconstruction, construction, commissioning, through closeout, Gilbane has exceeded our expectations on all levels. Not only do they listen to my needs, they have also managed the quality, cost, safety, and schedule to a level that far exceeded my hopes.”
Senior Data Specialist
Project Cardinal
Quick Stats
-
Client:
- Confidential
- Location: North Carolina
- Architect:
- Size: 460,000 SF
138
acre site
248,000
square feet of white space